PN 9000-280-VE, Rev B
Calibration/Aspirator Air
Required Calibration Gases and Tubing
See Specifications for information on calibration gases. The span gas
is the high gas; the zero gas the low gas.
The span gas must be 10 times greater than the zero gas. For example, if the
zero gas is 1 % O
2
, the span gas must be 10 % O
2
or higher.
• O
2
Span Gas
Instrument air (20.9%) or from 1.0–100 % O
2
.
• O
2
Zero Gas
From 0.1–10 % O
2
, balance N
2
For example, if using an operating range of 0 to 2000 ppm combustibles, use
1200 ppm CO, 1–2 % O
2
, balance N
2
.
Flow Calibration
A flow calibration must be performed upon analyzer startup. The WDG-V UOP
analyzer should be mounted on the process, fully up to normal operating tem-
perature, and have typical process gas flowing prior to performing the calibra-
tion.
• Once normal operation has been achieved, from the
Calibration
menu,
select
Flow Alarm Setup
.
• Press
Enter
to continue, then
Accept
to save the Flow Temperature mea-
surement.
The
Flow Alarm
setpoint is automatically set to 100 °C below the
Flow Temp
shown.
For process temperatures below 350 °C or for custom temperature
thresholds, contact the AMETEK Service Department.
Installation and Start-Up
|
2-9
Содержание WDG-V UOP
Страница 1: ...WDG V UOP Combustion Analyzer ATEX IECEx USER MANUAL PN 9000 280 VE_Rev C...
Страница 40: ...PN 9000 280 VE Rev B Figure 2 7 Conduit Entries 2 18 Thermox WDG V UOP ATEX IECEx Analyzer...
Страница 96: ...PN 9000 280 VE Rev B WDG V UOP Series Analyzer Rating Labels 4 6 Thermox WDG V UOP ATEX IECEx Analyzer...