3-6 | Model 5100 HD Analyzer
Connections to the Model 5100 HD are made at the power entry terminal block.
It is located in the customer connection box.
• Remove the cover of the customer connection box by removing the screws
holding it in place and lifting the cover upward and away from the box.
• Locate the power entry terminal block to make connections to the AC power
line.
• Thread the AC mains supply wiring through the conduit entry port on the
customer connection box and connect as shown below.
Mains supply connections to the terminal block are as follows:
Line =
Line connection
Neutral =
Neutral connection (USA)
Ground =
Ground connections
The 5100 HD must be ordered for either 120 VAC or 240 VAC since the oven
heater is voltage-specific.
GND 24V RET
+24 VDC
24 VDC Wiring for 5100 HD:
Содержание 5100 HD
Страница 23: ...Overview 1 11 Space Coupled Option Schematic...
Страница 24: ...1 12 Model 5100 HD Analyzer This page intentionally left blank...
Страница 39: ...Installation Start Up 3 11 I O Signals...
Страница 50: ...3 22 Model 5100 HD Analyzer This page intentionally left blank...
Страница 100: ...5 16 Model 5100 HD Analyzer This page intentionally left blank...
Страница 120: ...6 20 Model 5100 HD Analyzer...
Страница 129: ...Appendix A A 9 check or bump is performed disable or a span zero adjustment is performed enable...