Adjustments
82
Citan BAG0014.4 09.14
8. Take the calibration crank (Fig. 66/1) out of
its transport retainer next to the star wheel.
9. Put the calibration crank (Fig. 67/1) on the
star wheel (Fig. 67/2).
10. Turn the star wheel with the aid of the cali-
bration crank (Fig. 67/1) in counter clock-
wise direction until all compartments of the
metering wheels are filled with seed and the
seed evenly flows into the seed collecting
trays.
11. Close the injector sluice flap (Fig. 65/1) with
special care (danger of squeezing, see
danger advice [Fig. 65]).
12. Empty the seed collecting trays and replace
them underneath the metering units.
13. Open the injector sluice (Fig. 65/1).
Fig. 66
Fig. 67