Assembly and function
Citan BAG0014.4 09.14
63
5.22.1.1 Tramline rhythm 4 and 6
In illustration (Fig. 44) examples for the creation of tramlines with the
tramline rhythm 4, 6 and 8 are shown.
The operation of the seed drill at half its working width (part width
section) during the first travel in the field is illustrated.
During operation with the part width section switched off the drive for
the relevant metering wheel is stopped. Please take the detailed de-
scription from the operator's manual for AMATRON 3 / AMALOG
+
.
A second possibility to create tramlines with the tramline rhythm
4, 6 and 8 is to start the operation with the full working width and the
creation of a tramline (see Fig. 45).
In this case the husbandry machine will work with half working width
at the first run in the field.
Re-adjust the machine's working width after the first run in the field.
Fig. 45