96
Rockwell Automation Publication 2097-UM002D-EN-P - April 2017
Chapter 5
Configure and Start up the Kinetix 350 Drive System
The RSLogix 5000 - Motor and Feedback Test dialog box appears. The
Test State is Executing.
When the test completes successfully, the Test State changes from
Executing to Passed.
8.
Click OK.
This dialog box appears, to confirm that the direction was correct.
9.
Click Yes.
If the test fails, this dialog box appears.
a. Click OK.
b. Verify that the Axis status indicator turned solid green during the
test.
c. Verify that the drive ENABLE signal is applied to the axis you are
testing or that the enableInputChecking attribute is set to zero.
d. Verify the unit values that are entered in the Scaling category.
e. Return to main
and run the test again.
Содержание Kinetix 350
Страница 4: ...4 Rockwell Automation Publication 2097 UM002D EN P April2017 Summary of Changes Notes ...
Страница 50: ...50 Rockwell Automation Publication 2097 UM002D EN P April2017 Chapter 3 Kinetix 350 Drive Connector Data Notes ...
Страница 154: ...154 Rockwell Automation Publication 2097 UM002D EN P April2017 Appendix C Leakage Current Specifications Notes ...
Страница 159: ...Rockwell Automation Publication 2097 UM002D EN P April2017 159 Index Notes ...
Страница 160: ...160 Rockwell Automation Publication 2097 UM002D EN P April2017 Index ...
Страница 161: ......