Publication 1756-UM523F-EN-P - December 2006
Configure and Program the Controller
89
Condition Logic to Run After
a Switchover
You can condition a section of your logic to run after a switchover.
Follow these examples to create logic in preparation for a possible
switchover.
Example 1: Ladder Diagram
Get the ID of the primary chassis. That is always the chassis that runs the code.
Store the ID in the Chassis_ID_Now tag.
Chassis_ID_Now — DINT.
If this is the first scan then
Set the last value of the chassis ID = the ID of this chassis.
Chassis_ID_Last — DINT.
If the chassis ID changes, a switchover happened.
If a switchover occurs, then
1. Turn on the Switchover_Happened bit.
2. Set the last value of the chassis ID = the ID of this chassis.
Switchover_Happened — BOOL.
Continued on next page
Содержание 1756-CNB/E
Страница 4: ...Publication 1756 UM523F EN P December 2006 Summary of Changes 4 Notes...
Страница 10: ...Publication 1756 UM523F EN P December 2006 10 Table of Contents...
Страница 26: ...Publication 1756 UM523F EN P December 2006 26 ControlLogix Redundancy System Overview Notes...
Страница 42: ...Publication 1756 UM523F EN P December 2006 42 Design the System Notes...
Страница 64: ...Publication 1756 UM523F EN P December 2006 64 Configure the System Redundancy Module Notes...
Страница 102: ...Publication 1756 UM523F EN P December 2006 102 Configure and Program the Controller Notes...
Страница 146: ...Publication 1756 UM523F EN P December 2006 146 Update Modules and Redundant Systems Notes...
Страница 162: ...Publication 1756 UM523F EN P December 2006 162 Set Up EtherNet IP Communication Across Subnets Notes...
Страница 168: ...Publication 1756 UM523F EN P December 2006 168 Convert an Existing System to Redundancy Notes...
Страница 178: ...Publication 1756 UM523F EN P December 2006 178 Redundant System Restrictions Notes...
Страница 185: ......