
48
8. Starting the I-Check
14.4 V
01:34 m
0 Ah
CHARGED
22.3 A
46 Ah
I-CHECK
WET
OUT OF
VEHICLE
BATTERY IS O.K. and
must be charged
I-CHECK COMPLETE
During the I-Check, the input
power capability of the battery
will be checked over a period
of 5 minutes. It is charged at a
current of 30.0 A under a maximum
charging voltage of 14.4 V over 5
minutes. After this, a check of the
open-circuit voltage is made over
another minute when the current
is turned off in order to determine
whether there are any cell or plate
short-circuits. The test is complete
after a total of 6 minutes, and the
result is then shown in the display.
If the battery has passed the
I-Check, the display is coloured dark
green and the successful test is
confirmed. The result is shown for
2 minutes in the display, and after
this the charging process will auto-
matically start in "CHARGING"
operating mode with the selected
battery parameters.
BATTERY FAILED: 46Ah
TIME: 5min
CURRENT RATE: 9,7%
VOLTAGE: 14,3V/0,0V
CURRENT: 0,4A
CAPACITY: 0Ah
If the battery has not passed the
I-Check, the display will be coloured
red. The results of the test which
has not been passed will then be
displayed with the collected data
and can be written into the test
protocol.
The result will be shown in the
display until one of the two charging
clamps is disconnected from the
battery.
Содержание CHARGE CUBE 12-40
Страница 1: ...CHARGE CUBE 12 40 Operating manual Battery Charging System EN ...
Страница 2: ......
Страница 57: ...57 EN ...