GASGUARD
®
TE10 Distribution System Manual
Air Products and Chemicals, Inc.
Page 6 - 4
AIR PRODUCTS APx DISTRIBUTION SYSTEM FIELD START-UP CHECKLIST
page 1 of 8
CUSTOMER __________________System # _____________ SERIAL #___________
DEVICE DESCRIPTION __________________________________MODEL# _____________
GAS TYPE ___________________START DATE ___________ FINISH DATE ________
TOOL NAME ____________________ TECH REP _________________________________
CUSTOMER SYSTEM LABEL ___________________________________________________
VISUAL INSPECTION
PIPING/MECHANICAL
Check off line item when completed
Sign and date when section completed
Branch 1-4 (A-D)
Branch 5-8 (E-H)
Perform visual inspection to verify all mechanical and
electrical connections have been made.
Distribution System labeled correctly per Specification
Sheet.
No nylon collars stripped
Distribution System information received: ( circle )
Specification Sheet, Flow Schematic,
Customer I/O Drawing,
Inspection and Test Sheet (leak test and certification),
Quality Inspection and Test Sheet (functional test),
Installation and Operation Manual.
All open connections sealed
General appearance satisfactory
Verify leak test from gas bottle to P.O.U. complete
Verify corrosive or toxic scrubber and incinerator
operational and running
Pitot tube installed with correct 90
°
orientation
Tel tails installed
Verify exhaust line functioning
Panel under pressure 20 psig > < 25 psig
(1.4 barg
≥
≤
1.7 barg)
Correct venturi pressure present min. 75 psig
(5.2 barg)
Correct pneumatic pressure present 85 - 95 psig max.
(5.9 - 6.6 barg)
Purge cylinder installed
Gas detection system operational
Secondary containment installed
SECTION COMPLETED SIGNATURE__________________ DATE ________
Notes:___
______________________________________________________________
Содержание GASGUARD TE10
Страница 2: ......
Страница 12: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page i x...
Страница 70: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 3 4...
Страница 87: ...Section 4 Electrical Connections Revision August 2005 Page 4 7 Figure 4 5 Conduit and Conduit Seals...
Страница 92: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 4 12...
Страница 94: ......
Страница 154: ......
Страница 166: ......
Страница 174: ......
Страница 180: ......
Страница 188: ......
Страница 189: ...Appendix B Revision November 2004 Page B 1 Appendix B This Appendix contains the Nitrogen N2 Material Safety Data Sheet...
Страница 190: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 2...
Страница 191: ...Appendix B Revision November 2004 Page B 3...
Страница 192: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 4...
Страница 193: ...Appendix B Revision November 2004 Page B 5...
Страница 194: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 6...