Section 7: System Description
Revision – September 2009
7 - 7
EFS
Flow Switch (Optional)
This device senses an excess flow of process gas caused by
downstream system failure (tubing or component leak, valve or
regulator failure, etc.) and sends a switch signal to the controller to
shutdown the system.
Filter (Optional)
This device removes particles from the gas stream
CV
Check Valve
This safety device is used to prevent backflow of gas into another
section of the system.
Vacuum Venturi
This device is used to pull a vacuum on the process panel during
purge cycles. It uses a flow of nitrogen past an orifice to create a
vacuum as low as 26" Hg.
NOTE: Reference the specific system drawings and inserts in the document
envelope for additional component descriptions included in custom systems.
Содержание GASGUARD TE10
Страница 2: ......
Страница 12: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page i x...
Страница 70: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 3 4...
Страница 87: ...Section 4 Electrical Connections Revision August 2005 Page 4 7 Figure 4 5 Conduit and Conduit Seals...
Страница 92: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page 4 12...
Страница 94: ......
Страница 154: ......
Страница 166: ......
Страница 174: ......
Страница 180: ......
Страница 188: ......
Страница 189: ...Appendix B Revision November 2004 Page B 1 Appendix B This Appendix contains the Nitrogen N2 Material Safety Data Sheet...
Страница 190: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 2...
Страница 191: ...Appendix B Revision November 2004 Page B 3...
Страница 192: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 4...
Страница 193: ...Appendix B Revision November 2004 Page B 5...
Страница 194: ...GASGUARD TE10 Distribution System Manual Air Products and Chemicals Inc Page B 6...