![Agilent Technologies 8935 Series Скачать руководство пользователя страница 165](http://html1.mh-extra.com/html/agilent-technologies/8935-series/8935-series_manual_2868625165.webp)
164
Chapter 7
Periodic Adjustments
Running the System Power Calibration Program
Running the System Power Calibration
Program
This adjustment program is not found in ROM of the Test Set. This
program resides on a PCMCIA Memory Card, part-number
E6380-61811. It has to be downloaded from the memory card.
This program generates system power calibration factors for the Test
Set. The purpose of this program is to generate calibration factors for
the RF Input/Output Section module, high power attenuator, and
cables. This assures that the Test Set will meet its power measurement
accuracy specifications after repair.
An RF signal generator and a power splitter produce two signals with
the same power level. One signal is measured by the power meter, the
other is applied to the input of the Test Set. The program measures
these levels at selected frequencies and then generates calibration
factors so the Test Set readings match the power readings. These
calibration factors are stored in the Test Set.
Communication between the active instrument(s) is through the Test
Set’s GPIB port. An optional printer can be connected to the Test Set’s
GPIB, serial, or parallel port. Typically this is done from the Printer
Setup field of the SOFTWARE menu screen.
To run the System Power Calibration program:
1. Connect GPIB cables from the Test Set to the signal generator and
power meter.
2. Insert the PCMCIA Memory Card, P/N E6380-61811, into the Test
Set’s memory card slot.
3. Press
Menu
to access the SOFTWARE MENU screen.
4. Select the field under
Select Procedure Location:
5. Select
Card
under the
Choices
: menu.
6. Select the field under
Select Procedure Filename:
7. Select
SYSPWR0
8. Select
Run Test
(key
k1
).
9. Follow the instructions on the screen.
Содержание 8935 Series
Страница 34: ...34 Chapter 1 General Information Trademark Acknowledgements...
Страница 35: ...35 2 Product Information This chapter contains general information about the Test Set and how to service it...
Страница 93: ...92 Chapter 3 Troubleshooting Product Verification...
Страница 102: ...101 5 Disassembly This chapter explains how to disassemble the Test Set for major assembly replacement...
Страница 115: ...114 Chapter 5 Disassembly A2 Disassembly Figure 5 9 PC Board Assemblies...
Страница 135: ...134 Chapter 5 Disassembly Wire Cable Information...
Страница 139: ...138 Chapter 6 Replaceable Parts Parts Identification Covers and Chassis Parts Figure 6 2 External and Internal Covers...
Страница 150: ...Chapter 6 149 Replaceable Parts Parts Identification Figure 6 14 Cables Panel and Bottom Side Views...
Страница 157: ...156 Chapter 6 Replaceable Parts Parts List...
Страница 158: ...157 7 Periodic Adjustments This chapter contains the periodic adjustment procedures for the Test Set...
Страница 173: ...172 Chapter 7 Periodic Adjustments Eb No Calibration Program Description...
Страница 233: ...232 Chapter 8 Performance Tests CDMA Analyzer Modulation Accuracy Performance Test 29...
Страница 283: ...282 Chapter 9 Performance Test Records CDMA Analyzer Modulation Accuracy Performance Test 29 Record...
Страница 321: ...320 Chapter 10 Block Diagrams Instrument Control Section...
Страница 322: ...321 A Error Messages...
Страница 337: ...336 Appendix A Error Messages Non Recoverable Firmware Error...