©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
3-9
Chapter 3: Site Preparation – Planning: Assigning Specialists
Electrical Specialist
Your electrical specialist will plan and install the mains
power for the system, support bay and the convenience
outlets for the other system equipment. These items
should be marked on the system plan drawing. Chapter
6,
Site Preparation – Power Requirements
contains
the electrical information for Series 3 systems with the
E1135C PDU and Chapter 10,
Power Requirements for Older Systems
for Series I,
II, and Series 3 with the E1135B PDU
Vacuum Specialist
The vacuum specialist will plan and install your
system’s vacuum control system. Vacuum lines should
be marked on the system plan drawing. The information
pertaining to vacuum control is in Chapter 7,
Preparation – Compressed Air and Vacuum
Requirements
of this manual.
Compressed Air Specialist
The compressed air specialist will plan and install the
compressed air supply for your system. Air lines should
be marked on the system plan drawing. The compressed
air information is in Chapter 7,
Compressed Air and Vacuum Requirements
Communications Specialist
The communications specialist will plan your local area
network and install the LAN cables to your system.
LAN cables and telephone lines should be marked on
the system plan drawing. Chapter 8,
Communications Cabling Requirements
information for this specialist.