©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
10-134
Chapter 10: Site Preparation – Power Requirements for Older Systems: Tester Power Requirements (Series I/II)
4. POTS and xDSL bays always require a separate power drop. Use the POTS/xDSL power options that is in the column below on the same line as the
system power option.