©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
11-8
Chapter 11: Site Preparation – Series 3 / 79000 Current Reduction Conversion: Series 3 Current Reduction Conversion Procedure
Figure 11-2
Identifying the original 3070 power requirements
Shut Down the System
Execute
testhead power off.
Shut down the
controller.
1
Volts AC
A
RMS
=
Full Load
Amperes
Number
of Phases
MainsLabel1.wpg
1
Log in as superuser. Type:
shutdown -h 0