©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
11-21
Chapter 11: Site Preparation – Series 3 / 79000 Current Reduction Conversion: Series 3 Current Reduction Conversion Procedure
Table 11-7
Power option wiring cross-reference (three-phase)
Power Configuration
Power
Option
L-N Voltage/
L-L Voltage
- Phases
Testhead
Outlet Locations
327X
79000
317X
307X
Support Bay
Outlet
Location
1-PDU:
on
page 11-62
2-PDU:
Telecom
Bays
E1085A
POTS or
E2195A
xDSL