Agilent 3070 / 79000 Site Preparation
1-8
Chapter 1: Site Preparation – Process: Site Prep Checklist
Compressed Air and Vacuum
Requirements
[ ] Compressed air line installed?
[ ] Vacuum plan done?
[ ] How many solenoids needed? _____
[ ] Vacuum equipment installed?
Communications Cabling
Requirements
[ ] Local area network planned?
[ ] LAN cabling installed?
NOTE
The remaining items go beyond site preparation, but must be completed before installation. See the
System and
Support Bay Uncrating Instructions
(p/n’s E4000-90013 and E4000-90014 for a Series 3 system) attached to the ramp
of the shipping pallet and Chapter 9,
Site Preparation – Receiving and Moving Instructions
for further information.
Receiving and Moving
Instructions
[ ] Insurance coverage arranged for arrival?
[ ] System inspected for physical damage?
[ ] Shipment inventoried?
[ ] Equipment moved to installation site?
[ ] Testhead unpacked (Tri-wall box removed, but not removed from the pallet.). The
Agilent service representative will unpack the smaller boxes and move the system as
part of installation.
1. See Chapter 6,
Site Preparation – Power Requirements
for more information.
Table 1-1
Site preparation checklist (continued)
Task
Checklist