©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
10-16
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2001)
Single-Phase Center-Tap
Neutral
AWY
100 /
200
0E3
110 /
220
0EG
115 /
230
0EH
120 /
240
1. POTS and xDSL bays always require a separate power drop. Use the POTS/xDSL power options that is on the same line as the system power option.
Table 10-4
Series 3 and
79000
family wiring diagram (single-phase power) (continued)
E1135C
Power
Option
Voltage
Testhead
L1
L2
G
N