H
ARDWARE
I
NSTALLATION
Removing an Transceiver
To disconnect an LC connector, use the following guidelines:
1.
Press down and hold the locking clips on the upper side of the optic cable.
2.
Pull the optic cable out to release it from the transceiver.
Figure 1-26.
Removing a Fiber Optic Cable to a Transceiver
3.
Hold the handle on the transceiver and pull the transceiver out of the slot.
Handle
Figure 1-27.
Removing an SFP Transceiver
Replace the dust plug on the slot if you are not installing a transceiver. The
dust plug protects hardware from dust contamination.
1.10.3 Network Device Validation
Advantech industrial Ethernet switches support 10/100BaseT or 10/100/1000BaseT on
the RJ45 (copper) ports and 100BaseFX or gigabit Ethernet on the fiber optic ports. Make
sure the devices are connected to the corresponding ports for proper operation.
1.10.4 Validating Connectivity
It is important to ensure all devices are connected correctly to the switch. Once all Ethernet
and fiber cabling is connected, inspect the LED corresponding to connected cable. The LED
displays a solid or blinking light. Any LED that is off signifies a connectivity issue. Inspect the
port connection and the associated networked device. For further LED information see Sys-
tem LED Panel on page 12 and Activity and PoE LED Panel on page 13.
28
Содержание EKI-9312P Series
Страница 13: ...Hardware Installation Chapter 1...
Страница 43: ...First Time Setup Chapter 2...
Страница 48: ...Management Interface Chapter 3...
Страница 285: ...Troubleshooting Chapter 4...