24
Installation & Commissioning Guide PKY470-700 Tri-Capacity Package with CM100 Control
Doc. No.0525-032
Ver. 9 180921
ELECTRICAL
CONTROL INTERFACE INSTALLATION PROCEDURES - REMOTE LOCATION
CONTROL INTERFACE (CP05) MOUNTING DETAILS:
Dimensions:
Control Interface Mounting Cut-Out Details:
34.6mm
76mm
38.4mm
34.4mm
29mm
71mm
CONTROL INTERFACE (CP05) DE-MOUNTING PROCEDURE:
Panel Thickness
T = 1.2 - 6.0mm
Pull-out the Lateral Sliding
Plastic Brackets from the
Control Interface
PUSH
Press-on the Lateral Sliding
Plastic Brackets’ mid section
and Pull it out from the
Control Interface
T
CONTROL INTERFACE (CP05) REMOTE MOUNTING PROCEDURES:
Step 1:
Prepare a panel for mounting the Control Interface with cut-out dimensions as shown above.
NOTE: Use a Blank Cover-Plate to mount the Control Interface into a wall.
BlankCover- Plate
(Installer to Provide)
Cut-out Mounting Hole
(29mm H x 71mm W)
Step 2:
Insert the Control Interface unto panel cut-out, as shown:
Panel
Panel
Mounting Cut-out
(29mm H x 71mm W)
Control Interface
Insert Control Interface
unto Panel Cut-out
Содержание PKY470T-6Q2
Страница 78: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 79: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...