![ACOEM Met One Instruments GAS-1060 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/acoem/met-one-instruments-gas-1060/met-one-instruments-gas-1060_user-manual_459535037.webp)
Operation
Page 37
3.
Operation
3.1
Warm-Up
When the instrument is first turned on it must go through a period of adjustment and calibration. No
measurements are taken during this warm-up period.
The following activities occur during warm-up:
Int. Pump Adjust
If the internal pump option is enabled, the instrument remains in warm-up until the flow is within
10% of target.
Cell Temperature
The instrument will wait until it reaches 90% of target set point.
After this warm-up has completed the instrument will perform a background and then enter the
normal measurement cycle (refer to Section 3.2).
3.2
Measurement
The Serinus 60 NO
2
Analyser primarily operates in the sample measure cycle continuously. A
background is preformed after warm-up, and then normally once every 24 hours (by default) or as
defined in the
Measurement Settings Menu
which can be edited
by the user. The background is an
extinction measure without NO
2
present in the cell and is subtracted from sample measurements.
Table 2 – Measurements Times
Instrument State
Duration (seconds)
Description
BKGND FILL
120
background air is drawn through the measurement cell
purging the system
BKGND MEAS
30
Background air drawn through the measurement cell is
measured six times and then averaged
NO2 SAMPLE FILL
60
Sample is drawn through the cell purging the system
NO2 SAMPLE MEAS
5
NO
2
sample is measured
3.3
General Operation Information
3.3.1
Keypad & Display
The instrument is operated with the use of four sets of buttons:
Содержание Met One Instruments GAS-1060
Страница 10: ...Serinus 60 User Manual 3 0 Page 10 This page is intentionally blank...
Страница 18: ...Serinus 60 User Manual 3 0 Page 18 This page is intentionally blank...
Страница 35: ...Installation Page 35 Figure 7 Switching the Battery On Off...
Страница 36: ...Serinus 60 User Manual 3 0 Page 36 This page is intentionally blank...
Страница 102: ...Serinus 60 User Manual 3 0 Page 102 This page is intentionally blank...
Страница 122: ...Serinus 60 User Manual 3 0 Page 122 7 6 USB Memory Stick Failure Figure 64 USB Memory Stick Failure...
Страница 134: ...Serinus 60 User Manual 3 0 Page 134 9 5 Plumbing Schematic PN D020060...
Страница 135: ...Parts List Page 135 9 6 Block Wiring Schematic PN D020111...
Страница 136: ...Serinus 60 User Manual 3 0 Page 136 9 7 Measurement Cell Side Section PN H015000...
Страница 137: ...Parts List Page 137...
Страница 138: ...Serinus 60 User Manual 3 0 Page 138 9 8 Calibration Valve Manifold Assembly Exploded View PN H010013 01...
Страница 139: ...Parts List Page 139 9 9 Valve Assembly Exploded View PN H010042...
Страница 140: ...Serinus 60 User Manual 3 0 Page 140 9 10 High Pressure Valve Exploded View PN H050043...