88 Installation checklist
Motor
Power cables
2.
High voltage connections completed
3.
MCB ready to be tested with drive
4.
MCB interposing relay settings tested
5.
Local close order is disabled, and the connection to switch or button is canceled.
6.
The wiring of the control & signal cables connecting with the converter is finished.
7.
Safety devices checked and in operation
8.
The user manual and technical specification is available.
9.
Withstand voltage test of the MCB have been done according to Manufacture`s specifications.
The official test report must be available.
1.
Motor installed, aligned and alignment protocol available
2.
Motor decoupled from driven load
3.
Ground connection completed
4.
Customer side motor protection set and ready (e.g. winding temperature, vibration)
5.
Motor auxiliaries (e.g. bearing lubrication, heater cooling) ready
6.
The user manual and technical specification is available.
1. All cable screens are connected. Please take the photo and send back.
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...