Installation checklist 85
9
Installation checklist
Contents of this chapter
This chapter contains an installation checklist which you must complete before
commissioning can take place.
Safety
DANGER
High voltage!
Obey the instructions in chapter
. If you ignore them, injury or death,
or damage to the equipment can occur.
Before starting to work on the drive, make sure:
•
that the main and auxiliary power supply to the drive is switched off, locked out, and
tagged out
•
that the drive is dead
•
that safety ground connections are in place
•
that personal protective equipment is provided and used when required
•
that everyone involved is informed.
Before energizing the drive, make sure:
•
that all foreign objects are removed from the drive
•
that all internal and external covers are securely fastened and all doors are closed,
locked and / or bolted
•
that the release dials of safety switches are in the locked position.
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...