Maintenance 113
Replacing roof AC fans*
1. Stop, de-energize and ground the drive following the steps in section Shutting down
the drive for maintenance before you start the work.
2. Switch off the motor starter of the fan unit to isolate the fan unit from the auxiliary
power supply. To identify the motor starter, see the ACS580MV Wiring Diagram.
3. Remove the hex-head combination screws (M6x16) that attach the top cover to the fan
box. Lift the top cover and pull it away from the fan box.
4. Disconnect the connector and make sure that the supply connector is detached from
the support beam.
5. Remove the four hex-head combination screws (M6x16) that attach the support beam
to the side plate of fan box frame.
6. Fix the lifting eyes to the support beam. Attach lifting gear, appropriate for the weight
of the impeller, to the lifting eyes. Lift off the support beam and the impeller attached to
it.
NOTICE
For some types of fan boxes two additional hex-head combination screws must be
removed.
M6X16
combination
screw
Support
beam
4
Ͳ
M6X16
combination
screw
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...