Electrical installation 69
Cables and PE busbar between integrated transformer
and drive
Drive with integrated transformer
Cables and PE busbar between drive and integrated transformer includes the following
connections:
•
Transformer primary and secondary cables
•
Temperature sensor cables
•
Three-phase power supply cable to each of the transformer fan units
•
PE Busbar to connect INU and TRU.
or
Auxiliary supply from internal main transformer (option)
•
Heating cable (option)
The cables are identified by their specific number and are labeled with the designation of
the terminal where they are connected to.
The terminals for the primary and the secondary cables are located on the side wall of the
drive cabinet. The transformer terminals are accessible through the left side door of the
transformer unit. The cables must be mounted to the transformer terminals as shown in the
figure below.
1
2
1
Transformer unit
2
Drive unit
3
Control cable lead-through
4
PE busbar
4
3
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...