54 Transportation, storage and disposal
Unpacking and inspection
1
Remove all packaging material carefully.
2
Check the drive and accompanying equipment for damages.
3
Compare the complete delivery with the purchase order and the packing list.
4
If parts are missing or damaged, immediately inform the shipping company and ABB.
It is recommended to photograph the damages and send the photographs to ABB.
Lifting and transportation
It is recommended to have the following information at hand before transporting the
cabinet:
•
Chapter
provides details on dimensions, weight, and of center of
gravity of the cabinet.
•
Chapter
provides instructions if the door of the INU compartment cannot
be opened.
General notes on transportation
•
Drive components can be damaged during transportation. Therefore, transport the
cabinet in an upright position.
•
Transport separated units only!
•
Keep the doors closed to prevent dirt from entering. Metallic dust in particular can
cause damage and failure when the drive is energized.
Dimensions and weights
•
Choose the load capacity according to the following table
,
for center of gravity see
ACS580MV Gravity Center for Packing
Type
Drive unit
Transformer unit
Height
(mm)
Depth
(mm)
Width
(mm)
Weight
(kg)
Height
(mm)
Depth
(mm)
Width
(mm)
Weight
(kg)
6/6.3R1
2571
1176
1815
1100
2571
1176
2215
1800
6/6.3R2
2571
1176
1815
1150
2571
1176
2215
1950
6/6.3R3
2571
1176
1815
1200
2571
1176
2215
2300
6/6.3R4
2571
1176
1815
1300
2571
1176
2215
2700
6/6.3R5
2571
1176
1815
1300
2571
1176
2215
3300
6/6.3R6
2571
1176
1815
1350
2571
1176
2415
3650
6/6.3R7
2571
1376
3015
2300
2571
1376
2615
4800
6/6.3R8
2571
1376
3015
2450
2571
1376
2615
6350
6/6.3R9
2571
1376
3015
2600
2571
1376
3215
7700
6.6R1
2571
1176
1815
1150
2571
1176
2215
1850
6.6R2
2571
1176
1815
1200
2571
1176
2215
2100
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...