136 Maintenance
before you start the work.
2. Switch off all miniature circuit breakers in the control compartment.
3. Undo the fastening screw and remove the battery (see A in figure
above).
4. Insert the new battery according to the figure
.
5. Set the real-time clock.
6. When the work is completed the drive can be started up again. See Chapter
Operation, Energizing and starting the drive
.
7. Dispose the old battery according to local disposal rules and applicable laws.
High voltage divider board
To locate the high voltage divider board see figure
Control compartment with open swing
Procedure:
1. Stop, de-energize and ground the drive following the steps in section
before you start the work.
2. Switch off all miniature circuit breakers in the control compartment.
3. Loosen the cable connection at the board to be removed.
4. Hold the divider board and remove the two fixation screws.
5. Install the replacement divider board in reverse order of removal.
6. When the work is completed, the drive can be started up again. See Chapter
Operation, Energizing and starting the drive
.
CVMI2 board
To locate the CVMI2 board, see figure
Terminal compartment with cover plate removed
page
Procedure:
1. Stop, de-energize and ground the drive following the steps in section
before you start the work.
2. Switch off all miniature circuit breakers in the control compartment.
3. Unplug the fiber optic link (A1, A8), the power supply connector (X201) and the signal
connectors (X203, X204, X205, X206, X207,).
4. Loosen the 4 fixation screws and remove the board.
5. Install new CVMI2 board reconnect in reverse order of removal.
6. When the work is completed the drive can be started up again. See Chapter
Operation, Energizing and starting the drive
.
Control hub
To locate the control hub see figure
Inverter unit (drive type 11R6)
on page
.
Procedure:
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...