Mechanical installation 63
Fixing the base to the floor
Location of tool kit and accessories
1.
COU Key
Key for control unit fix on the door of COU.
2.
Combination screws
Screws for combining converter and transformer are fixed on the door of control unit.
3.
Tool Kit
You can find the tool kit by open the door of control unit. It is on the bottom of the
cabinet.
Open the box, you can find all the tools and accessories for future use. A description
of all the items in the kit is delivered alongside. Please pay attention to the screw
A
B
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...