![ABB ACS580MV Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/abb/acs580mv/acs580mv_hardware-manual_3348342062.webp)
62 Mechanical installation
Bolting together the units
Required bolts are attached to the drive unit side wall adjoining the transformer unit. Align
the units. Then bolt the units together using the 12 hexagonal bolts with 5N·M(see figure
below).
Fixing units to the floor
Floor fixings are not supplied. 16 anchor bolts as illustrated (B in figure below), or screws,
nuts and washers of size M16 are recommended (diameter of holes in base frame: 18 mm).
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...