82 Electrical installation
Preparing control cables for EMC plates
6. Pull the cables through the EMC cushions.
7. Push the cushions together so they fit tightly around the bare screen and tighten the
screws.
Connecting the cables
•
Connect the cables for digital and analog input and output signals to the corresponding
terminals / modules.
•
If a twisted pair cable is used, leave the unshielded cable ends twisted until they reach
the terminals.
•
Leave unshielded conductor ends as short as possible (not longer than
50 mm)
.
•
Connect the shield of serial communications cables to the PE busbar located near the
fieldbus adapter.
1
2
2
3
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...