2
Principal Switch Operations ........................................................... 20
5.3.1. A-BPM Operations ..................................................................... 20
5.3.2. S-BPM Operations ..................................................................... 23
5.3.3. Other Operations ....................................................................... 25
Blood Pressure Measurement Functions ........................................... 27
Automatic Blood Pressure Measurement (A-BPM) ........................ 27
6.1.1. A-BPM Waiting Mode ................................................................. 29
6.1.2. Sleep Function and Interval time ................................................ 29
6.1.3. Stopping Measurement .............................................................. 30
6.1.4. Storing Environment Data .......................................................... 30
Self Blood Pressure Measurement (S-BPM) .................................. 31
6.2.1. S-BPM Programs ....................................................................... 32
6.2.2. S-BPM Waiting Mode ................................................................. 36
6.2.3. Stopping and Suspending Measurement ................................... 37
Measurement Results .................................................................... 38
6.3.1. Displaying Measurement Results ............................................... 38
6.3.2. Storing Measurement Results .................................................... 38
6.3.3. Outputting Measurement Results ............................................... 39
6.3.4. ID Numbers ................................................................................ 39
Preparing the Recorder ..................................................................... 40
Installing the Batteries (Replacing Batteries) ................................. 40
7.1.1. How to Replace Batteries ........................................................... 42
Preparing the Carry Holder ............................................................ 42
Inspection for Use .......................................................................... 43
7.3.1. Battery Pre-installation Checklists .............................................. 43
7.3.2. Battery Post-installation Checklists ............................................ 44
Содержание TM-2441
Страница 20: ......
Страница 36: ...16 4 2 Dimensions 66 24 5 95 Unit mm...
Страница 89: ...69 Air hose Air hose Cuff Belt Carry holder Air plug Air socket Insert Carry holder Belt Tape Clip...
Страница 119: ......