139
5.3.61 PoE Scheduler
This page provides power scheduling configurations.
The entry is used to control the power alive interval on PoE port.
It is allowed to set the specific interval to schedule power on/off in one week.
Object
Description
Power Scheduling Interval Configuration
Day
Checkmarks indicate which day are members of the set.
Interval
Start - Select the start hour and minute.
End - Select the end hour and minute.
Action
Power On - Select the radio button to apply power on during the interval.
Power Off - Select the radio button to apply power off during the interval.
Power Scheduling During
Time Interval
There are 48 time interval one day. Each interval has 30 minutes.
Day
The current scheduling state is displayed graphically during the week.
Green indicates the power is on and red that it is off.
Directly changes checkmarks to indicate which day are members of the time interval.
Check or uncheck as needed to modify the scheduling table.
Summary of Contents for RGS Series
Page 7: ...7 Preface Scope Audience Safety Instructions Documentation Conventions ...
Page 9: ...9 Overview Overview Faceplate Panel Introduction ...
Page 13: ...13 Quick Installation Equipment Mounting Cable Connecting Equipment Configuration ...
Page 18: ...18 Figure 6 RGS200 12P Series Ground Connections ...
Page 36: ...36 5 2 1 Configuration Menu ...
Page 37: ...37 5 2 2 Monitor Menu ...
Page 38: ...38 5 2 3 Diagnostics Menu 5 2 4 Maintenance Menu ...
Page 54: ...54 5 3 12 Privilege Level This page provides an overview of the privilege levels ...
Page 238: ...238 Click to re start diagnostics with PING ...
Page 252: ...252 台灣 警告使用者 ...