ZXR10 8900 Series Hardware Installation Manual
the circuit is an open circuit. If the result shows that it is not
an open circuit, then the cabinet is not insulated with earth.
Examine the insulated tube. Repeat the last step and insula-
tion test.
Note:
Insulation test has to be implemented immediately after each
cabinet footing is fixed.
Result:
Cabinet has been installed by adjustable base.
Installing Cabinet on Floor Directly
To install cabinet on floor directly, perform the following steps.
1. Cabinet Height Regulation
As shown in
Figure 35
, loosen the four bolts that fasten the
truckles and then remove the truckles. Loosen the four lock-
nuts of footing. Place the cabinet on the corresponding position
of the edge expansion bolt on NOC room floor manually or by
lifting machine. Make sure that the right, left, front and back
plane of cabinet are parallel with the NOC room walls. Use the
height adjusting nut on footing to regulate the height of cabi-
net.
After installing the panel wood, there is 5mm clearance be-
tween the bottom of panel wood and floor, as shown in
Figure
35
.
F
IGURE
35 T
HE CLEARANCE BETWEEN
P
ANEL
W
OOD AND
F
LOOR
1.
Cabinet
2.
Panel Wood
3.
Floor
2. Cabinet Leveling
The cabinet must be vertically installed. Place level bar on
the two perpendicular directions of cabinet top panel. Use the
height adjusting nut to regulate the horizontality and vertical-
ity of cabinet. Installed horizontality and verticality deviation
42