ZXR10 8900 Series Hardware Installation Manual
Cabinet Base Installation Preparation
Prepare necessary instruments and project design material and
installation guide material before cabinet base installation.
�
Engineering Design and Installation Drawing
�
Tools
�
Steel tapeline
For measure cabinet position suit cabinet installation re-
quirement or not, measure adjustable base positioning hole
size, diameter and other measurement.
�
Marking pen
This marks location mark of joint drill on antistatic floor,
and mark installation of expansion bolt drill on floor.
�
Score template
It is supported by shipper. Please prepare it before cabinet
installation.
�
Percussion drill (Φ14 drill bit)
This drills on the floor or on the antistatic floor.
�
Vacuum cleaner
This removes the dust inside the hole after drilled.
�
Rubber hammer
This taps expansion blot for fixed
�
Pad
This adjusts the base level.
�
Torque wrench
This fastens the blots and nuts.
Introduction to Cabinet Base
Installation
There are three modes to install cabinet base,
�
Adjustable base installation mode
�
Install cabinet on floor directly
�
Fixed base installation mode
18
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXR10 8900 Series
Page 6: ......