ZXR10 8900 Series Hardware Installation Manual
After adjustment tighten the bolt to 45Nm with a torque
wrench, tighten flexible frame with activity frame. The side
bolt must be tightened first, then tighten front bolt, to ensure
that activity frame and fixing frame are connected tightly.
For adjustable Base (Model A and Model B), every joint of ac-
tivity frame and fixing frame use 3 high locked bolts; For ad-
justable Base (Model C), every joint of activity frame and fixing
frame use 4 high locked bolts.
3. Fix base
After adjustment, height of two adjustable bases for each cab-
inet must have a deviation of no more than 1mm. Clean floor
and base surface.
Align installation holes on bases to cor-
responding expansion bolts. Fix base to floor with the nuts
and washers. Tighten them to 45Nm with a torque wrench as
shown in
Figure 17
.
F
IGURE
17 F
IXATION OF
A
DJUSTABLE
B
ASE
1.
Adjustable base
2.
Expansion base
3.
Nut
4.
Spring washer
5.
Flat washer
6.
Adjust washer
When the floor is not even, use the provided adjustment shims
between the base and the floor. The shims are of 1mm and
2mm thick, as shown in
Figure 18
.
26
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXR10 8900 Series
Page 6: ......