ZXR10 8900 Series Hardware Installation Manual
Front panel and back panel are necessary for one cabinet. Use
M5×12 screws to connect the top panel with top of cabinet, as
shown in
Figure 55
.
F
IGURE
55 T
OP
P
ANEL
I
NSTALLATION
D
IAGRAM
1.
Screw M5×12
2.
Cabinet
3.
Top panel
2. Install top inside panel
i. Open angle support on one side of cabinet top.
ii. Fix angle support and top inside panel on top of cabinet.
iii. Tighten top panel and top inside panel by M5×12 screws.
iv. Perform the same steps to install the other side top inside
panel.
Top inside panel installation diagram is shown in
Figure 56
.
58
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXR10 8900 Series
Page 6: ......