ZXR10 8900 Series Hardware Installation Manual
F
IGURE
41 F
IX THE
C
ABINET BY
B
OLT
1.
Cabinet
2.
Base
3.
Flat Washer
4.
Spring Washer
5.
Screw M16×100
3. Insulation Test
Modify the multimeter to resistance grade. Use the two mea-
suring heads to touch the cabinet earthing point and expansion
bolt. Measure their resistance. Continue the next step if the
circuit is an open circuit. If the result shows that it is not an
open circuit, then the cabinet is not insulated with earth. Ex-
amine the insulated tube. Repeat the last step and insulation
test.
Note:
Insulation test has to be implemented immediately after each
cabinet footing is fixed.
Result:
Cabinet has been installed by fixed base.
48
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXR10 8900 Series
Page 6: ......