Removing the Monitor Board and SpO2 Modules
9650-0804-01 Rev. A
ZOLL Propaq M Service Manual
55
Removing the Monitor Board and SpO
2
Modules
Tool Required
•
# 1 Phillips screwdriver with torque capability
Setup
•
This procedure should be conducted on a static mat.
•
Wear a wrist strap to ground during the procedure.
•
Complete these procedures in the following order before performing this procedure:
1.
“Removing the Handle” on page 43
2.
“Disassembling the Main Unit” on page 44
3.
“Removing the Front Enclosure Module” on page 47
4.
“Removing the Display Module” on page 49
5.
“Removing the EtCO2 and NIBP Modules” on page 51
Note:
After replacing the Monitor Board and/or SpO
2
modules, see Chapter 4, "Resetting
Life Cycle Counters" to reset the life cycle counter for the module.
To reinstall the monitor board and/or SpO
2
modules, reverse the steps.
Monitor Board and/or SpO
2
Disassembly
1
Remove the EtCO2 anti-conductive shield
that lies on top of the unit.
2
Remove six (6) screws to release the
monitor board in the areas illustrated.
Note: During reassembly, torque screws to
6 in-lbs.
shield
Summary of Contents for Propaq M
Page 1: ...Propaq M Service Manual 9650 0804 01 Rev A December 2010...
Page 36: ...CHAPTER 1 MAINTENANCE TESTS 32 9650 0804 01 Rev A...
Page 44: ...CHAPTER 2 TROUBLESHOOTING 40 9650 0804 01 Rev A...
Page 50: ...46 9650 0804 01 Rev A 11 Disconnect the NIBP tube from the rear case NIBP hoses NIBP tube...
Page 52: ...48 9650 0804 01 Rev A 6 Remove the ZIF Zero Insertion Force flex cable using an orange stick...
Page 66: ...CHAPTER 5 REPLACEMENT PARTS 62 9650 0804 01 Rev A...
Page 70: ...CHAPTER 6 FUNCTIONAL DESCRIPTION 66 9650 0804 01 Rev A...
Page 72: ...68 9650 0804 01 Rev A Propaq M Electrical Hardware Interconnect Diagram...
Page 74: ...70 9650 0804 01 Rev A...
Page 78: ...74 9650 0804 01 Rev A...