Index
ZEISS
Prevention
HBO 100
adjusting
assembling
installing
I
Improper use
Intermediate plate for analyzer slider
installing
Interpupillary distance
L
Lambda 4/plate
Lambda plate
LED modules for Colibri 3
changing
usability
LED10 light source for reflected light
assembling
LED10 light source for transmitted light illu-
mination
assembling
Light Manager
disabling
enabling
function
saving ratios
Location requirements
Low-power system
assembling
centering
M
Magnification changer
assembling
Mains
connecting to
Mains connection
Maintenance
interval
schedule
work
Mechanical stage
additional sleeves removing
adjusting the friction
installing
recovering the travel range
setting the drive length
Mechanical stage, motorized
installing
Mechanical stage, rotatable
centering
Modulator disk
installing
N
Nosepiece
O
Object guide
installing
Objective
centering
Operation
Prerequisites
Optional system expansions
Installation
P
Path differences
Permanent mode
Phase contrast
Photo tube
Pinhole diaphragm
PlasDIC
PlasDIC slit diaphragm
installing
Pleochroism
Polarization
Polarization direction
Polarization contrast
circular
Polarizer
Polarizer, mounting
Power supply
HAL 100
HBO 100
HBO 100
Prerequisites
Operation
R
Reflected light
brightfield
C-DIC
darkfield
DIC
fluorescence
polarization
TIC
Reflector module
assembling
Reflector slider
Reflector turret
assembling
Requirements
for Operators
Reticle
Rotary stage
202
Instruction Manual ZEISS Axioscope 5, Axioscope 5/7 MAT | en-US | Rev. 13 | 430035-7344-001