REFRIGERANT PIPING NOTES
1. Based on R-22 at the nominal capacity of the unit or system, an ambient temperature of 95°F (35°C) and a suc
-
tion temperature of 45°F (7.2 °C).
2. Suction line sizes were calculated based on a nominal maximum pressure drop of 3 PSI/100 ft. (20.7kPa30.5m)
.Whencalculating suction line pressure drop for a specific application, it should be noted that system capacity
decreases as suction line pressure drop increases.
3. Liquid pressure drop (or gain) due to a vertical liquid line is not included in the tables and must be taken into ac-
count when determining pressure drop (or gain) of the liquid line. The nominal value that must be included in the
liquid line loss (or gain) is .5 PSI/foot (3.4 kPa/30 cm) of rise (or gain). To ensure a solid column of liquid refrigerant
to the expansion valve, the total maximum pressure drop of the liquid line should not exceed 40
PSI (276 kPa)
based on 15°F (8.3 °C) subcooled liquid. Vapor in the liquid line, even in small amounts, will measurably reduce
valve capacity and poor system performance will result. In addition, pressure loss for strainers, filter driers, sole
-
noid valves, and isolation valve or fittings are not included in this table, and must be taken into account.
4. Nominal Tons (KW) Unloaded is based on one compressor (per system) operating at design conditions.
5. Based on minimum compressor staging for the given pipe size, a double suction riser should be used to ensure
proper oil return to the compressor on all vertical suction risers. Oil returning up the riser moves up the inner
surface of the pipe and depends on the mass velocity of the refrigerant vapor at the wall surface to move the oil
up the vertical rise. Using piping of this size will allow velocities at part load to fall below 1000 fpm (5.08 m/s)
minimum required for oil return.
6. Hot gas bypass lines are typically 7/8" for lines up to 40 feet and 1-1/8" for lines over 40 feet (12 meters) in length.
The field connections sizes are 7/8" for the optional factory mounted hot gas bypass valve.
7. For more information, please refer to either the York DX Piping Application Guide or the ASHRAE Refrigeration
Handbook.
Hot gas bypass is only available
for refrigerant system number 1.
1
Summary of Contents for YCUL0045
Page 13: ...JOHNSON CONTROLS 13 FORM 150 63 NM6 1020 This page intentionally left blank...
Page 31: ...JOHNSON CONTROLS 31 FORM 150 63 NM6 1020 1 This page intentionally left blank...
Page 35: ...JOHNSON CONTROLS 35 FORM 150 63 NM6 1020 1 This page intentionally left blank...
Page 71: ...JOHNSON CONTROLS 71 FORM 150 63 NM6 1020 1 This page intentionally left blank...
Page 79: ...JOHNSON CONTROLS 79 FORM 150 63 NM6 1020 This page intentionally left blank...
Page 117: ...JOHNSON CONTROLS 117 FORM 150 63 NM6 1020 2 This page intentionally left blank...
Page 120: ...JOHNSON CONTROLS 120 FORM 150 63 NM6 1020 Unit Controls THIS PAGE INTENTIONALLY BLANK...
Page 139: ...JOHNSON CONTROLS 139 FORM 150 63 NM6 1020 3 This page intentionally left blank...
Page 141: ...JOHNSON CONTROLS 141 FORM 150 63 NM6 1020 4 LD08801...
Page 145: ...JOHNSON CONTROLS 145 FORM 150 63 NM6 1020 4 LD08946...
Page 147: ...JOHNSON CONTROLS 147 FORM 150 63 NM6 1020 4 LD08800...
Page 151: ...JOHNSON CONTROLS 151 FORM 150 63 NM6 1020 4 LD08776...
Page 153: ...JOHNSON CONTROLS 153 FORM 150 63 NM6 1020 4 LD08804...
Page 155: ...JOHNSON CONTROLS 155 FORM 150 63 NM6 1020 4 LD08781...
Page 157: ...JOHNSON CONTROLS 157 FORM 150 63 NM6 1020 4 This page intentionally left blank...
Page 159: ...JOHNSON CONTROLS 159 FORM 150 63 NM6 1020 4 LD08803...
Page 161: ...JOHNSON CONTROLS 161 FORM 150 63 NM6 1020 4 LD08807...
Page 163: ...JOHNSON CONTROLS 163 FORM 150 63 NM6 1020 4 LD08785...
Page 165: ...JOHNSON CONTROLS 165 FORM 150 63 NM6 1020 4 This page intentionally left blank...
Page 167: ...JOHNSON CONTROLS 167 FORM 150 63 NM6 1020 4 LD08806...