1.
Open the front flap of your I/O module.
2.
Bring the front connector in cabling position.
For this you plug the front connector on the module until it locks. In this position the
front connector juts out of the module and has no contact yet.
3.
De-isolate your wires. If needed, use core end cases.
4.
If you want to lead out your cables from the bottom of the module, start with the
cabling from bottom to top, res. from top to bottom, if the cables should be led out at
the top.
5.
Bolt also the connection screws of not cabled screw clamps.
6.
Put the included cable binder around the cable bundle and the front connector.
7.
Fix the cable binder for the cable bundle.
8.
Bolt the fixing screw of the front connector.
9.
Now the front connector is electrically connected with your module.
10.
Close the front flap.
11.
Fill out the labeling strip to mark the single channels and push the strip into the front
flap.
2.7 Installation guidelines
The installation guidelines contain information about the interference free deployment of a
PLC system. There is the description of the ways, interference may occur in your PLC,
how you can make sure the electromagnetic compatibility (EMC), and how you manage
the isolation.
40pole screw connection
392-1AM00
General
VIPA System 300S
Assembly and installation guidelines
Installation guidelines
HB140 | SM-DIO | | en | Rev. 16-43
19