
133
5. Prime the fuel system using the manual pump of the coarse fuel
filter.
6. Start the engine, check the junction for leaks. If necessary,
additionally tighten the replaceable filters.
7. In case of leakage, unscrew the replaceable fuel filter; check the
condition of the sealing ring and its bearing seat.
ATTENTION!
USE ONLY THE MODEL 50
10
437
143
REPLACEABLE FILTER ELEMENTS MANUFACTURED BY
MANN+HUMMEL GMBH (GERMANY)
ATTENTION!
USE ONLY «MANN+HUMMEL» REPLACEABLE
FUEL FILTERS
WARNING!
DO NOT START THE ENGINE IF THE FUEL SYSTEM
IS NOT FILLED WITH FUEL. THAT MIGHT RESULT IN THE HIGH-
PRESSURE FUEL PUMP FAILURE. (THE FUEL SYSTEM PRIMING
PROCEDURE IS DESCRIBED IN THE VEHICLE OPERATION
MANUAL).
Summary of Contents for YMZ-536
Page 14: ...14 Fig 1 YMZ 536 engine right side view ...
Page 15: ...15 Fig 1 a YMZ 536 engine left side view ...
Page 16: ...16 Fig 1 b YMZ 536 10 engine right side view ...
Page 17: ...17 Fig 1 c YMZ 536 10 engine left side view ...
Page 18: ...18 Fig 1 d YMZ 536 30 engine right side view ...
Page 19: ...19 Fig 1 e YMZ 536 30 engine left side view ...
Page 20: ...20 Fig 1 f YMZ 5362 engine right side view ...
Page 21: ...21 Fig 1 g YMZ 5362 engine left side view ...
Page 22: ...22 Fig 1 h YMZ 53602 engine right side view ...
Page 23: ...23 Fig 1 i YMZ 53602 engine left side view ...
Page 51: ...51 Fig 10 Longitudinal section ...
Page 52: ...52 This page intentionally left blank ...
Page 96: ...96 Fig 33 High pressure fuel pump ...
Page 99: ...99 Fig 35 Injector control The injector installation in the cylinder head is shown in Fig 36 ...
Page 168: ...168 NOTES ...