2 - 28
SPEC
1
Air vent hose
2
Spark plug lead
3
Starter cable
4
Throttle cable
5
Clutch cable
6
Clamp
7
Cable guide
8
Engine oil breather hose
9
Overflow hose
Å
After clamping the starter cable, push it against the starter plunger.
ı
Put the tip of the air vent hose into the main pipe.
Ç
Install the primary coil terminal (orange) to the ignition coil.
Î
Fasten the ground lead together with the ignition coil.
‰
Pass the starter cable so that it is not twisted.
Ï
Tighten the starter choke nut while taking care not to twist the starter cable.
Ì
Pass the clutch cable on the inside of the throttle and starter cable.
Ó
Clamp the clutch cable with the paint in the cable guide bottom recess.
È
Pass the throttle cable and starter cable into the cable guide.
Ô
Pass the engine oil breather hose and overflow hose between the right
half of the swingarm and pillar tube.
Clamp the engine oil breather hose, overflow hose and air vent hose to 2 clicks.
CABLE ROUTING DIAGRAM
Summary of Contents for TT-R125(S) 2003
Page 49: ...GEN INFO MEMO...
Page 179: ...INSP ADJ MEMO...
Page 571: ...ELEC MEMO...
Page 585: ...ELEC MEMO...
Page 605: ...ELEC MEMO...
Page 608: ......
Page 609: ......