3 - 30
INSP
ADJ
STEERING HEAD INSPECTION AND ADJUSTMENT
●
Install the upper bracket
A
, steering stem
nut
B
, cap
C
, handlebar
D
, upper han-
dlebar holder
E
, starter knob nut
F
and
number plate
G
.
NOTE:
●
The upper handlebar holder should be
installed with the punched mark
a
for-
ward.
●
Insert the end of fuel breather hose
H
into
the hole of the starter knob stay.
CAUTION:
First tighten the bolts on the front side of
the handlebar holder, and then tighten
the bolts on the rear side.
T
R
.
.
Pinch bolt (upper bracket):
25 Nm (2.5 m • kg, 18 ft • lb)
Steering stem nut:
110 Nm (11.0 m • kg, 80 ft • lb)
Handlebar upper holder:
23 Nm (2.3 m • kg, 17 ft • lb)
Starter knob nut:
1 Nm (0.1 m • kg, 0.7 ft • lb)
Number plate:
7 Nm (0.7 m • kg, 5.1 ft • lb)
TT-R125E/TT-R125LWE
●
Steering ring nut
Steering ring nut adjustment steps:
●
Remove the number plate and starter
knob.
●
Remove the main switch, handlebar and
upper bracket.
●
Remove the special washer
1
.
●
Remove the upper ring nut
2
, and rubber
washer
3
.
●
Loosen the lower ring nut
4
using the
steering nut wrench
5
.
Steering nut wrench:
YU-33975/90890-01403
Summary of Contents for TT-R125(S) 2003
Page 49: ...GEN INFO MEMO...
Page 179: ...INSP ADJ MEMO...
Page 571: ...ELEC MEMO...
Page 585: ...ELEC MEMO...
Page 605: ...ELEC MEMO...
Page 608: ......
Page 609: ......