2 - 35
SPEC
1
Clamp
2
Clutch switch lead
3
Engine stop switch lead
4
Brake hose (Brake cable for the
TT-R125E)
5
Clutch cable
6
Throttle cable
7
Main switch lead
8
Start switch lead
Å
Fasten the clutch switch lead
and engine stop switch lead to 3
clicks.
ı
Pass the brake hose (brake
cable for the TT-R125E) in front
of the number plate and through
the cable guide.
Ç
Pass the clutch cable in back of
the number plate.
Î
Starting at the forepart, pass the
main switch lead, clutch cable
and start switch lead in that
order.
‰
Pass the start switch lead in
back of the starter cable.
Ï
Pass the main switch lead on
the right of the number plate
stay.
Ì
Fasten the throttle cable
adjuster cover and start switch
lead with a plastic locking tie
ends downward.
Ó
Fasten the start switch lead to 3
clicks.
È
Pass the start switch lead in the
middle of the brake master cyl-
inder bracket. (TT-R125LWE
only)
Ô
Pass the engine stop switch
lead in the middle of the clutch
holder.
A
A
8
7
3
1
1
2
3
4
5
6
7
1
8
Ó
Å
ı
Ç
Î
‰
Ï
Ì
Ô
È
CABLE ROUTING DIAGRAM
Summary of Contents for TT-R125(S) 2003
Page 49: ...GEN INFO MEMO...
Page 179: ...INSP ADJ MEMO...
Page 571: ...ELEC MEMO...
Page 585: ...ELEC MEMO...
Page 605: ...ELEC MEMO...
Page 608: ......
Page 609: ......