CABLE ROUTING (FJR13ESG)
2-66
1. Clutch hose
2. AC magneto lead
3. Rectifier/regulator lead
4. Air filter case breather hose
5. Gear position switch lead
6. Gear position switch coupler
7. Fuel tank breather/overflow hose
8. Sidestand switch
9. Sidestand switch lead
10. Oil level switch lead
11. Coolant reservoir breather hose
12. Sidestand switch coupler
13. Oil level switch coupler
14. Coolant reservoir
15. Horn lead
16. Front brake caliper (left)
17. Front wheel sensor
18. Brake hose (brake pipe/upper joint assembly to
front brake calipers)
19. Front wheel sensor lead
20. Starter motor lead
21. Accelerator position sensor lead
22. Throttle servo motor lead
23. Crankshaft position sensor lead
24. Wire harness
25. Brake hose (metering valve to right front brake
caliper)
26. Brake hose (front brake master cylinder to brake
pipe/lower joint assembly)
A. Route the clutch hose in front of the front fork as
shown in the illustration.
B. Secure the plastic band by inserting the projection
on the band into the hole in the windshield drive
unit bracket, and then fasten the handlebar switch
leads, front wheel sensor lead, grip warmer leads,
front brake light switch lead, and clutch switch lead
with the band, making sure that the end of the
band faces down. Do not cut off the excess end of
the plastic band.
C. Route the AC magneto lead to the outside of the
horn lead.
D. To fuel tank
E. Insert the projection on the wire harness holder
completely into the hole in the frame.
F. Route the gear position switch lead so that the
coupler is positioned as shown in the illustration.
G. Pass the fuel tank overflow hose through the guide
on the universal joint dust cover.
H. Pass the air filter case breather hose through the
guide on the muffler bracket.
I.
When installing the left side cowling, make sure
that the end of the coolant reservoir breather hose
protrudes from the bottom of the cowling.
J. Make sure that the paint mark on the coolant
reservoir breather hose is positioned to the rear of
the holder.
K. To horn
L. 43
–
53 mm (1.69
–
2.09 in)
M. 85
–
95 mm (3.35
–
3.74 in)
N. Fasten the front wheel sensor lead and brake hose
(brake pipe/upper joint assembly to front brake
calipers) with the holder. Make sure that the front
wheel sensor lead is positioned to the rear of the
brake hose.
O. Pass the front wheel sensor lead through the
guide.
P. Fasten the grommet on the front wheel sensor lead
with the holder.
Q. Fasten the grommet on the brake hose (brake
pipe/upper joint assembly to front brake calipers)
with the holder.
R. Fasten the front wheel sensor lead to the brake
hose (brake pipe/upper joint assembly to front
brake calipers) with the two holders, making sure
to position the lead to the inside of the hose.
S. Fasten the clutch hose with the holder.
T. After securing the wire harness, rotate the hose
clamp until the ends of the clamp contact the
harness.
U. Route the starter motor lead and crankshaft
position sensor lead under the throttle body pulley
bracket.
V. Route the starter motor lead between the rear
balancer cover bolt and the rib on the crankcase.
W. When installing the clutch hose onto the clutch
release cylinder, make sure that the pipe section
on the end of the hose contacts the stopper on the
clutch release cylinder body.
X. Fasten the protective sleeve of each lead.
Summary of Contents for FJR13AG
Page 1: ...2016 SERVICE MANUAL FJR13AG FJR13ESG B88 28197 70 E0 ...
Page 6: ......
Page 8: ......
Page 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 21 EAS30021 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 1 3 2 ...
Page 77: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 24 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 6 5 4 3 2 1 ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 1 2 3 4 5 6 7 8 9 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 4 5 3 2 1 9 8 6 7 ...
Page 86: ...COOLING SYSTEM DIAGRAMS 2 33 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Page 94: ...CABLE ROUTING FJR13AG 2 41 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Page 102: ...CABLE ROUTING FJR13AG 2 49 Rear fender top view 1 2 3 A B 4 5 6 C C D ...
Page 108: ...CABLE ROUTING FJR13AG 2 55 Fuel tank and canister B C 2 3 1 A A ...
Page 116: ...CABLE ROUTING FJR13ESG 2 63 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Page 124: ...CABLE ROUTING FJR13ESG 2 71 Rear fender top view 7 E 6 D 5 C C 1 2 3 4 A B 8 9 10 ...
Page 130: ...CABLE ROUTING FJR13ESG 2 77 Fuel tank and canister B C 2 3 1 A A ...
Page 132: ...CABLE ROUTING FJR13ESG 2 79 ...
Page 135: ......
Page 173: ......
Page 406: ...MIDDLE GEAR 5 77 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Page 438: ...BALANCERS 5 109 ...
Page 454: ...WATER PUMP 6 15 ...
Page 477: ......
Page 485: ...IGNITION SYSTEM 8 8 ...
Page 493: ...ELECTRIC STARTING SYSTEM 8 16 ...
Page 499: ...CHARGING SYSTEM 8 22 ...
Page 517: ...CORNERING LIGHT SYSTEM FJR13ESG 8 40 ...
Page 527: ...SIGNALING SYSTEM 8 50 ...
Page 613: ...FUEL INJECTION SYSTEM 8 136 ...
Page 633: ...CRUISE CONTROL SYSTEM 8 156 ...
Page 651: ...ACCESSORY BOX SYSTEM 8 174 ...
Page 663: ...IMMOBILIZER SYSTEM 8 186 ...
Page 669: ...ABS ANTI LOCK BRAKE SYSTEM 8 192 ...
Page 722: ...ELECTRICAL COMPONENTS 8 245 6 1 3 2 17 20 19 18 7 8 11 12 13 14 15 16 4 5 10 9 ...
Page 744: ...ELECTRICAL COMPONENTS 8 267 ...
Page 779: ......
Page 780: ......