5-7
GB
Procedure
1)
Remove the top cowling.
2)
Remove the flywheel cover by remov-
ing the bolts.
3)
Prepare the engine for starting. See
STARTING ENGINE for procedures.
Be sure the engine is in Neutral and
that the lanyard is attached to the
engine stop switch. The main switch
must be on.
NOTE:
8
In this case, choke switch will not oper-
ate. Pull out the choke knob when
engine is cold.
8
Without setting the main switch to ON,
it is impossible to start the engine.
4)
To start the engine with the emer-
gency starter rope, insert the knotted
end of the rope into the notch in the
flywheel rotor and wind the rope sev-
eral turns clockwise. Then, give a
strong pull straight out to crank the
engine. Repeat if necessary.
w
Do not install the top cowling when
engine is running.
208036
208041
ON
START
OFF
ON
START
OFF
ON
START
OFF
64C-9-76 (E,F,ES) 5 4/25/0 3:12 PM Page 204
Summary of Contents for 100A
Page 2: ...64C 9 15 6 4 25 0 4 19 PM Page 124 ...
Page 67: ... MEMO 64C 9 76 E F ES 2 4 25 0 2 53 PM Page 65 ...
Page 157: ... MEMO 64C 9 76 E F ES 4B 5 1 00 3 06 PM Page 149 ...
Page 218: ...EMP00010 Chapter 6 INDEX INDEX 6 1 GB 64C 9 76 E F ES 6 4 25 0 3 13 PM Page 210 ...
Page 226: ...64C 9 15 6 4 25 0 4 19 PM Page 124 ...