
EGCP-2 Engine Generator Control Package
Manual 26174
vi
Woodward
Illustrations and Tables
Figure 5-16. Changing the Priority of a Slave Unit .............................................143
Figure 5-17. Changing the Priority of a Slave Unit .............................................143
Figure 5-18. Changing the Priority of a Slave Unit .............................................144
Figure 5-19. Changing the Priority of a Slave Unit .............................................144
Figure 6-1. Relationship Between Voltage Bias and Generator Voltage ...........153
Table 4-1. Overcurrent Level Chart ...................................................................... 82
Table 4-2. Reverse Power Chart .......................................................................... 84
HIGH VOLTAGE—Only authorized personnel knowledgeable of the
risks posed by live electrical equipment should perform the
calibration and checkout procedure.