Appendix
Check list for installation preparations for self-service systems
01750058390 G
ProCash 2050xe USB - Installation Guide
173
Power and data cables
yes
no
OK
Are the AC power outlets available in accordance
with the installation instructions?
Are the data cables available?
Is the alarm connection prepared?
Have the camera connection and the door opener
been provided?
Organizational preparations
yes
no
OK
Is the generation prepared on the host?
Has the MM module or CIM86 been ordered and
is it available?
Have the encryption/decryption or EPP keys been
prepared?
Is the paper and money ready for start-up?
Have you discussed the diameter of the hole that
is to be drilled and the fixing to be used for the
tear-off sensor with the local alarm provider?
Diameter?
Fixing to be used?
Summary of Contents for ProCash 2050xe USB
Page 1: ...Installation Guide ProCash 2050xe USB Self Service Systems ...
Page 3: ...Edition June 2010 ProCash 2050xe USB Installation Guide ...
Page 18: ...Introduction 6 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 166: ...Start up Installation 154 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 200: ...Environmental protection Appendix 188 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 201: ...01750058390 G ProCash 2050xe USB Installation Guide Notes ...
Page 202: ...Published by WINCOR NIXDORF International GmbH D 33094 Paderborn Order No 01750058390 G 2 GB ...