Installing the tunnel frame
Installation
142
ProCash 2050xe USB - Installation Guide
01750058390 G
Pulling out/pushing in the customer panel
•
Open the operating unit door (see chapter "Basic Operation" in the
operating manual).
•
Push the two release levers of the customer panel down (1). Pull the
customer panel forward out of the device as far as possible (2).
Summary of Contents for ProCash 2050xe USB
Page 1: ...Installation Guide ProCash 2050xe USB Self Service Systems ...
Page 3: ...Edition June 2010 ProCash 2050xe USB Installation Guide ...
Page 18: ...Introduction 6 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 166: ...Start up Installation 154 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 200: ...Environmental protection Appendix 188 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 201: ...01750058390 G ProCash 2050xe USB Installation Guide Notes ...
Page 202: ...Published by WINCOR NIXDORF International GmbH D 33094 Paderborn Order No 01750058390 G 2 GB ...