Installing the tunnel frame
Installation
152
ProCash 2050xe USB - Installation Guide
01750058390 G
Connecting the tunnel frame light
•
Connect the two cables below the tunnel frame (see arrow).
Lay the cables in such a way that they will not be damaged when the
customer panel is pulled out or pushed in.
•
Loosen the securing screw until it no longer sits in the lower groove of the
track (see section "Pulling out/pushing in the customer panel").
•
Then push the customer panel into the device until the release levers click
into place.
•
Close the device.
Summary of Contents for ProCash 2050xe USB
Page 1: ...Installation Guide ProCash 2050xe USB Self Service Systems ...
Page 3: ...Edition June 2010 ProCash 2050xe USB Installation Guide ...
Page 18: ...Introduction 6 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 166: ...Start up Installation 154 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 200: ...Environmental protection Appendix 188 ProCash 2050xe USB Installation Guide 01750058390 G ...
Page 201: ...01750058390 G ProCash 2050xe USB Installation Guide Notes ...
Page 202: ...Published by WINCOR NIXDORF International GmbH D 33094 Paderborn Order No 01750058390 G 2 GB ...