30
Annual Planned Maintenance
The following parts are recommended for annual planned
maintenance replacement to ensure optimum unit
performance and minimize downtime:
• Refrigerator door gasket (cleaning may be sufficient)
• Two (2) #6 O-rings for the water and CIP hose quick
connect lines
• Blender Shaft Assemblies
The evaporator for the on board ice maker should be
inspected at least once a year. The evaporator service life
also depends on the water quality and environment. More
frequent inspection and maintenance are recommended to
keep performance of this ice maker optimized.
NOTE: All planned maintenance must be done by an
approved, certified Manitowoc Field Service Technician.
Summary of Contents for FB081TF
Page 4: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 24: ...24 Part Number REV00 04 08 2020 Operation Section 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 88: ...88 Part Number REV00 04 08 2020 Charts Section 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 93: ......
Page 94: ......
Page 95: ......